Rice Companies completed the design-build construction of Bede Hall for St. John’s Preparatory School, expanding academic space within the historic campus. The project included a four-story structure constructed with steel framing, brick exterior materials, and a built-up roof system. A connector links the new building to an existing campus landmark, maintaining architectural continuity. The completed facility provides modern educational space while respecting the character and history of the surrounding campus.
LOCATION: Collegeville, MN
SIZE: 23,500 Sq. Ft.
PROJECT TYPE: New Construction